Ironclad Roofing Co. — Asheville, NC — Est. 2001

Every roof starts as a drawing before it becomes a promise.

We spec, tear off, and stand behind residential and commercial roofs across the Blue Ridge foothills — from a torn shingle on a Montford bungalow to a full standing-seam re-roof on Reynolds Mountain. Written scope before any nail moves.

25Years in the field
3,800+Roofs completed
4Dedicated install crews
150 mphTop wind rating installed
Scroll — the approach

Fig. 01 — Our Approach

We tear off before we talk price.

Most estimates in this trade are written from the driveway. Ours are written from the deck — after the old roofing is stripped back far enough to see what's actually underneath, photographed, and logged against the scope we handed you in writing.

That order of operations is slower on paper. In practice it means the number on your invoice is the number we quoted, decking damage is priced per sheet with a photo attached, and nothing gets "discovered" halfway through a Friday install.

1Crew per roof, start to finish
21Point inspection, every survey
0Subcontracted install crews

Fig. 02 — Material Tiers

Three specifications. One crew and warranty behind all of them.

Every tier below ships with the same install crew and workmanship guarantee — what changes is wind rating, impact class, and how long the material itself is warrantied.

Entry Tier

Fieldstone Series

Dimensional asphalt laminate · algae-resistant

A clean, durable everyday shingle for rental units, resale flips, and homeowners who want a warrantied roof without the architectural upgrade.

  • Wind rating110 mph
  • Manufacturer warranty30 yrs, limited
  • Best forRentals · resale
  • Installed, per sq. ft.from $6.80
Most Specified

Ridgeline Series

Class 4 impact-rated architectural laminate

Our default recommendation for primary residences — heavier profile, better hail resistance, and often eligible for an insurance premium discount.

  • Wind rating130 mph
  • Manufacturer warranty50 yrs, non-prorated
  • Best forPrimary residences
  • Installed, per sq. ft.from $9.40
High-Performance

Summit Series

24-gauge standing-seam steel · Kynar 500 finish

Specified for coastal exposure, steep mountain pitches, and homeowners who want snow to shed rather than sit. Mechanically seamed, not screwed.

  • Wind rating150 mph
  • Finish warranty50 yrs
  • Best forHigh-wind · steep pitch
  • Installed, per sq. ft.from $16.20
They pulled up the old felt and showed us the rot before they showed us a price.
D. Ferris — Montford, Full Re-Roof

Fig. 03 — Selected Work

Case studies, not a photo gallery.

A sample of jobs across the past two seasons — the material, the neighborhood, and the one detail that made the job what it was.

Historic Match · Ridgeline Series

Montford Craftsman Re-Roof

Montford, Asheville · 28 squares · 3 days

A 1923 bungalow with an original diamond-cut cedar profile at the street-facing gable. We drafted a matching cut pattern in laminate before ordering material, and preserved the original dentil trim at the eaves rather than boxing over it.

Storm & Insurance

Kenilworth Hail Claim

Kenilworth · 42 squares

Met the adjuster on-site the same week as the storm; claim approved with no supplement fight.

New Construction · Summit Series

Biltmore Forest Standing Seam

Biltmore Forest

24-ga standing seam spec'd for a 12/12 pitch and heavy mountain snow load.

Storm Response

Haw Creek Emergency Tarp

Haw Creek

Tree limb through the decking during a June storm — tarped within six hours of the call, full repair closed out inside two weeks.

Commercial · TPO

West Asheville Brewery Roof

West Asheville · 9,200 sq ft

TPO membrane over an occupied rooftop taproom — phased install, zero service downtime.

Steep-Slope · New Build

Reynolds Mountain

Reynolds Mountain

Permanent harness anchors set into the framing for every future service call on the 12/12 pitch.

Fig. 04 — Sequence of Work

Five steps, in this order, every time.

STEP 01 / 05

Site survey & drone scan

Full elevation photos, a decking moisture check from the attic side, and a drawn scope of work before we talk numbers.

STEP 02 / 05

Written spec & material order

Shingle or panel line, underlayment brand, flashing metal, fastener spec — itemized and signed before the crew is scheduled.

STEP 03 / 05

Tear-off & decking repair

Old roofing stripped to bare deck. Rotted sheathing is replaced per sheet, at a photographed rate, not a flat surprise fee.

STEP 04 / 05

Install, flashing & ventilation

Full crew sets field, valleys, step flashing at every wall, and ridge ventilation to the manufacturer's spec.

STEP 05 / 05

Final walkthrough & closeout binder

Joint walkthrough, a magnet-roller sweep of the yard, and a binder with warranty paperwork and job photos handed over.

Four different roofers looked at that valley leak. Ironclad was the only one who found the actual cause.
R. Okonkwo-Bell — Kenilworth

Fig. 05 — Warranty & Terms

Nothing on the estimate is a guess.

Every proposal lists the exact shingle or panel line, underlayment brand, and fastener spec we're installing. If you file an insurance claim, the same document goes to your adjuster — no separate "insurance version."

Financing is available for both storm claims and out-of-pocket replacements, and decking is always billed per sheet with a photo of the damage attached to your invoice.

Spec Sheet — Ridgeline SeriesRev. 03
Shingle warranty50 yrs, non-prorated
Workmanship warranty25 yrs, transferable once
Wind ratingUp to 150 mph (Summit)
Impact ratingClass 4 — UL 2218
Avg. install time1–4 days, by scope
Financing0% APR, 12–18 mo.
Decking replacementBilled per sheet, photographed
Insurance billingDirect, adjuster meeting included

Fig. 06 — Service Area

Four crews, dispatched by zone.

Storm damage doesn't wait for one crew to work down a list. We run four install crews so claims and repairs move fast after a bad system comes through.

AshevilleDowntown, Montford, West Asheville, Kenilworth≤ 24 hrs
Biltmore Forest & Haw Creek≤ 24 hrs
Black Mountain & Reynolds Mtn.1–2 days
Weaverville & Fletcher1–2 days
Hendersonville2–3 days

Fig. 07 — The Crew Roster

The people on your roof, not a subcontractor's.

MF
Marcus Ferro
Founder & Principal · 27 yrs
Started on a hammer crew in '99. Still climbs the ladder personally on storm days.
DO
Dee Okafor
Field Superintendent · 19 yrs
Oversees all four crews and signs off on every final walkthrough before closeout.
TR
Tomás Reyes-Vela
Crew Lead, Steep-Slope Division · 14 yrs
Standing-seam and high-pitch specialist — leads the Summit Series installs.
CH
Colin Haas
Estimating & Insurance Liaison · 9 yrs
Meets every adjuster on-site personally and drafts the written scope you sign.
Explained the whole insurance process before we ever picked a shingle. Zero surprises on the invoice.
S. & P. Whitfield — Fletcher

Fig. 08 — Before You Schedule

Questions worth asking any roofer.

Q01Will you meet my insurance adjuster on-site?+
Yes, on every storm claim. Colin or Marcus attends in person and documents the damage against the adjuster's own scope, so the paperwork lines up on both sides.
Q02How long does a full tear-off take?+
Most residential jobs run 1–3 days. Complicated valleys, steep pitches, or a Summit standing-seam install typically run 3–4 days — always specified in writing before we start.
Q03Do you automatically replace rotted decking?+
No. Decking is priced per sheet and only replaced where the tear-off finds actual rot or damage — we photograph the sheet before it comes off and it's itemized on your invoice.
Q04What actually separates the three shingle tiers?+
Wind rating, impact class, and warranty length. The install crew and the 25-year workmanship warranty are identical no matter which tier you choose.
Q05Can you match an older or historic roofline?+
Usually, yes — the Montford job matched an original 1923 diamond-cut profile. Bring photos or an old spec sheet if you have one and we'll draft a matching pattern before ordering material.

Fig. 09 — Get Started

Get a written scope before a single shingle moves.

Free 21-point inspection, drone photos included, no obligation. Storm damage gets same-week priority scheduling.